Pointing repair
Colour-matched pointing repair, carried out before moisture works deeper into the brickwork.
Build your quote
A tailored, no-obligation quote in a few clicks. You finish on the quote page, where everything is already filled in.
Which service(s) do you need?
You can select more than one option.
Roughly how large is the facade area?
What type of property is it?
Short description optional
Add photos optional
Who should we send the quote to?
Please fill in your name, phone number and email.
Why choose RVP Gevelonderhoud?
Pointing is the weakest point of any facade. During the survey we see straight away where the moisture gets in and whether it is local repair or a larger job. Because we do the cleaning and the impregnation ourselves, the work joins up seamlessly.
- Over 20 years specialising in facade maintenance
- Adjustable working pressure, no needless damage to the pointing
- Powerful pre-treatment and warm water for the best result
- Windows and frames washed down straight away
- Cleaning, pointing, lead and impregnation all in house
- Free survey and 10% discount for returning customers
Pointing repair by RVP Gevelonderhoud
Moisture makes brickwork crack and bricks work loose. Repairing the pointing in time prevents structural problems later on. After cleaning the facade we repair the joints where needed, in preparation for impregnation.
In most cases pointing repair can be matched well to the original colour. Completely invisible repair is rare and depends heavily on the original mortar mix. We tell you up front what to expect.
- Colour-matched repair
- Prevents structural damage
- The basis for impregnation
- Honest about the result

Sequence and drying time
Pointing repair always happens after cleaning. Pointing a dirty facade means sealing the dirt in. After the repair, two weeks of drying time are needed before the facade can be impregnated.
On facades with damaged pointing or cracking, no local guarantee can be given on the impregnation. We point those areas out during the survey so you know where you stand.

Our approach
Survey of the pointing
We look at where the joint has worn away, works loose or shows cracks.
Cleaning
The facade is cleaned first, otherwise you seal dirt in behind the new pointing.
Rake out and repoint
The failed pointing is removed and reapplied to match the colour.
Drying and finishing
Two weeks of drying, after which the facade can be impregnated.